PREFABRICATION AND WORKSHOP
FABRICATED AND TESTED OFF-SITE. READY TO INTEGRATE ON-SITE.
Our 1,600m² Campbellfield workshop lets us build under controlled conditions, reducing site time, risk, and disruption.
BUILT FOR ACCURACY BEFORE SITE.
Prefabrication moves the hardest work into a controlled environment. Spools and modules are fabricated, welded, and quality-checked in the workshop, then delivered to site ready to install. Less rework, less downtime, better quality.
WHAT WE DELIVER
HOW WE WORK.
Pipe spooling and modular fabrication in a controlled workshop environment.
Quality control and testing completed before anything reaches site.
Modular prefabrication that integrates cleanly with on-site work.
1,600m² facility in Campbellfield, Victoria.
The 2025 ASSDA Fabricator of the Year award specifically recognised TPM's modular prefabrication techniques on high-pressure hydrogen pipework.
WHERE IT'S USED
WANT THE BENEFITS OF PREFABRICATION?
Talk to a team with a workshop built for it.