Skip to main content

New announcement. Learn more

PREFABRICATION AND WORKSHOP

FABRICATED AND TESTED OFF-SITE. READY TO INTEGRATE ON-SITE.

Our 1,600m² Campbellfield workshop lets us build under controlled conditions, reducing site time, risk, and disruption.














BUILT FOR ACCURACY BEFORE SITE.

Prefabrication moves the hardest work into a controlled environment. Spools and modules are fabricated, welded, and quality-checked in the workshop, then delivered to site ready to install. Less rework, less downtime, better quality.

WHAT WE DELIVER

HOW WE WORK.

  • Pipe spooling and modular fabrication in a controlled workshop environment.

  • Quality control and testing completed before anything reaches site.

  • Modular prefabrication that integrates cleanly with on-site work.

  • 1,600m² facility in Campbellfield, Victoria.

The 2025 ASSDA Fabricator of the Year award specifically recognised TPM's modular prefabrication techniques on high-pressure hydrogen pipework.

WHERE IT'S USED

WANT THE BENEFITS OF PREFABRICATION?

Talk to a team with a workshop built for it.

AWARD-WINNING. ACCREDITED. AUSTRALIAN.